Extention existing commercial space Bonaire
The owner of a commercial building we previously constructed requested the addition of three supplementary storage units. After the engineering phase, all components for the steel structure and sandwich panels were shipped. Once on location in Bonaire, construction could commence. The concrete floor and necessary penetrations and drains were already prepared. The structure, consisting of Sigma profiles and Z-structures, could be quickly assembled. Cladding for the 676 m2 of walls followed, and with the installation of the overhead doors, construction was completed within 14 days. The expansion seamlessly complements the architectural style of the previously delivered commercial building. |